Regulated asset base scheme could be used for construction of two reactors at Sizewell C
Ministers in the UK are in the process of drawing up legislation that will allow the construction of two EPR units at Sizewell C nuclear power station in Suffolk, southeast England through the use of a regulated asset base (RAB) financing scheme, the Financial Times reported.