XAMR

Flag France
Basics
Reactor Type
Molten Salt Reactor
Reactor Description
Fast MSR
Electric Output (MWe) 40
Thermal Output (MWt) 80
Size
Small
Spectrum
Fast
Developer NAAREA
Pilot Site Details N/A
Details
Use (goal of commercial operation) electric power and heat generation
Deployment medium Land-based
Design Lifetime (Years) 40
Fuel
Fuel class
HALEU
Fuel Type
Plutonium Chloride
Fuel Cycle Closed
Cooling & Temperature
Reactor cooling of primary loop Molten Salt
Reactor moderator N/A
Reactor Outlet Temperature (°C) 625
Status
Design status Conceptual design
Licensing status
  • Oct 2024 - A technical seminar was held with the participation of the French regulator ASN and IRSN to look at the design and safety approach for a XAMR prototype
  • Since 2023, Naarea involved in project preparatory review discussions with French regulator ASN
Deployment timeline
  • 2024 - Start prototype basic design and pre-licensing phases
  • 2028 - Safety file submission for a prototype to ASN regulator target
  • 2030 - Mass production aimed at to begin
  • mid-2030s - Commercial deployment target 
Agreements and Engagement
  • Jul 2024 - Cooperation signed with with the Centre National de la Recherche Scientifique (CNRS) and the Université Paris-Saclay
  • Feb 2024 - Patnership signed with Thorizon to advance molten salt reactors
  • Jan 2024 - Partnership signed with Newcleo for support in the companies' respective industrial, technological, scientific and regulatory development
  • Aug 2023 - Naarea operated first silicon carbide molten salt loop in the world (for RPV)
  • Jul 2023 - Naarea awarded funding under the France 2030 investment plan focused on innovative nuclear reactors
  • In 2023 - Signed agreement with Assystem to develop a digital twin of XAMR
  • In 2023 - Agreement announced with France's ROBATEL for XAMR fuel feasibility study