Aurora
Basics
Reactor Type
Liquid Metal Reactor
Reactor Description
Fast LMR
Electric Output (MWe)
1.5 - 75
Thermal Output (MWt)
4 - 150
Size
Micro
'Micro' size
Electric output of less than 10 MWe
Electric output of less than 10 MWe
Small
'Small' size
Electric output of between 10 MWe and 100 MWe
Electric output of between 10 MWe and 100 MWe
Spectrum
Fast
Kinetic neutron energy of 1…20 Mev
Kinetic energy of a not-moderated particle (neutron spectrum)
Kinetic energy of a not-moderated particle (neutron spectrum)
Developer
OKLO, Inc.
Pilot Site Details
Idaho National Lab, Idaho
Details
Use (goal of commercial operation)
electricity, heat
Deployment medium
Land-based
Design Lifetime (Years)
40
Fuel
Fuel class
HALEU
High-assay low enriched uranium
Uranium enriched to 5…20 percent U-235
Uranium enriched to 5…20 percent U-235
MOX
Mixed-oxide (nuclear fuel)
Fuel made from a mix of uranium and plutonium oxides
Fuel made from a mix of uranium and plutonium oxides
Fuel Type
Metallic U-Zr Alloy
Fuel Cycle
N/A
Refuelling Cycle
N/A
Cooling & Temperature
Reactor cooling of primary loop
Sodium
Reactor moderator
None
Reactor Outlet Temperature (°C)
500
Status
Design status
Detailed design
Licensing status
- Nov 2024 - Received environmental...
- Nov 2024 - Received environmental compliance permit from the US DOE and the INL
- Oct 2024 - DOE approved concept of Aurora fuel fabrication facility
- In 2023 - Began pre-application process for fuel fabrication
- Sep 2022 - Oklo restarted application process with NRC
- Jan 2022 - US NRC rejected application over failure to provide sufficient info on key topics
- In 2020 - Submitted combined licence application to US NRC
- In 2019 - Site permit granted by US DOE for INL demonstrator (approved in 2021)
- In 2016 - Engaged in pre-application process with US NRC
Deployment timeline
Commercial deployment in early 2030s
Agreements and Engagement
- Aug 2024 - Signed preferred...
- Aug 2024 - Signed preferred supplier agreement with Siemens Energy for steam turbine
generator products and services - Apr 2024 - Signed a pre-agreement with small data centre company Equinix to procure up to 500 MW of nuclear energy
- In 2024 - Signed MoU with Atomic Alchemy to collaborate on isotope production
- In 2024 - Initiative to advance the deployment of two Aurora powerhouses in Southern Ohio
- In 2022 - Awarded grants under two US DOE's ARPA-E programmes: OPEN and ONWARDS
- In 2023 - Oklo confirmed it's part of process to build microreactor at Eielson airbase in Alaska by end of 2027
- In 2021 - Signed partnership with fuel enricher Centrus Energy